We Succeed To Deliver...

I1600 SQ. MT. STEEL STRUCTURE WORKSHOP, O.H. CRANE 10 TON

Customer :TRUST Company

Location:Qatar. Doha

Contractor: TRUST Company

Project type:Engineering

Duration:348 Hr. / 2017

Scope: Mechanical Engineering Protection Engineering Material Verification Construction Methodology Quality System ASME Stamping

ARCHITECTURE ENGINEERING FOR NO. 6 VILLA 1100 SQU. MT. PER EACH

Customer :TRUST Company

Location:Qatar. Doha

Contractor: TRUST Company

Project type:Engineering

Duration:760 Hr. / 2017

Scope: Architecture Engineering 3D Modeling Landscaping

ARCHITECTURE ENGINEERING FOR NEW PALACE, 2500 SQUARE METER

Customer :TRUST Company

Location:Qatar. Doha

Contractor: TRUST Company

Project type:Engineering

Duration:320 Hr. / 2017

Scope: Architecture Engineering 3D Modeling Interior Design Landscaping

ASSET INTEGERITY MANAGEMENT AND HAZOP

Customer :ESCO Company

Location:UAE. Abu-Dahbi

Contractor: ESCO Company

Project type:Consultation

Duration:176 Hr. / 2017

Scope: AIM Works Corrosion Managemet HAZOP Verification

SIL, SAFTEY INTEGERATED LEVEL AND HAZOP

Customer :ESCO Company

Location:KSA

Contractor: ESCO Company

Project type:Consultaion

Duration:130 Hr. / 2016

Scope: HAZOP Verification SIL Studies Rehabilitation Guides

TERMINAL / STORAGE TANK, NO. 2 FLOATING ROOF TANK, DIA. 89MT

Customer :ESCO Company

Location:UAE. Abu-Dahbi

Contractor: ESCO Company

Project type:Engineering

Duration:114 Hr. / 2016

Scope: Mechanical Engineering Protection Engineering Material Verification Construction Methodology Quality System

THREE PHASE SEPARATOR, NO. 2 UNIT, CAPACITY 25K BBL

Customer :Life Tech. Engineering Co.

Location:Uk. London

Contractor: Life Tech. Engineering Co.

Project type:Engineering

Duration:320 Hr. / 2016

Scope: Mechanical Engineering Protection Engineering Material Verification Construction Methodology Quality System ASME Stamping

DESLUDGING AND CLEANING FOR STORAGE TANK# 1, DIA. 50MT

Customer :Belayim Petroleum Company

Location:Eg. Sinai. Abu-Rudis Field

Contractor: EMC Company / AGEP Co.

Project type:Environment

Duration:540 Hr. / 2015

Scope: Crude Oil recovery Sludging Removing Internal Cleaning Inspection preparation

UG. GRE WATER INJECTION PIPELINE, SIZE 6 INCH, LENGTH 10 KM

Customer :Belayim Petroleum Company

Location:Eg. Sinai. Abu-Rudis Field

Contractor: Petromaint Company

Project type:Engineering

Duration:464 Hr. / 2015

Scope: Mechanical Engineering Protection Engineering Material Verification Construction Methodology Quality System

CS. WASHING / STORAGE TANK 5000 CUBIC METER PER EACH

Customer :Belayim Petroleum Company

Location:Eg. Sinai. Abu-Rudis Field

Contractor: Petromaint Company

Project type:Engineering

Duration:464 Hr. / 2014

Scope: Mechanical Engineering Civil Engineering Protection Engineering Material Verification Construction Methodology Quality System

CHEMICAL / FUEL ST. ST. STORAGE TANK FARM, NO. 4 TANK

Customer :Adabyia Port Company

Location:Eg. Suez. Adabyia Port

Contractor: Suez Metal Company

Project type:Engineering

Duration:1440 Hr. / 2014

Scope: Mechanical Engineering Civil Engineering Protection Engineering Material Verification Construction Methodology Quality System

UG. ST. ST. CHEMICAL PIPELINE, SIZE 6 INCH, LENGTH 6 KM

Customer :Adabyia Port Company

Location:Eg. Suez. Adabyia Port

Contractor: Suez Metal Company

Project type:Engineering

Duration:544 Hr. / 2013

Scope: Mechanical Engineering Protection Engineering Material Verification Construction Methodology Quality System