Consultaion
Academy Vs Practical Solution
Academy Vs Practical Solution
Our engineering consultation Serve all engineering business to insure the efficiency and production quality as well as qualifying those companies for the modern management systems
Our AIM experts provide customized solutions at any level of the development and implementation process. Program development Program Management Resources to implement Program Gap analysis
Risk Based Inspection [RBI] Our methodology in RBI, [how to control corrosion risk vs production economics under the full integration level with asset management [AIM]
(SIL) assessment determines the effectiveness of safety systems based on the probability of tolerable incidents that can occur within a number of processing demands. With our experience in hazard and risk management , Petroproject are extremely well placed to deliver SIL assessments.
The determination of Safety Integrity Levels (SIL) for safety components and systems is part of Petroproject’s overall Quantitative Risk Assessment (QRA) service.
Petroproject conduct SIL studies in accordance with International standard IEC 61511 and have conducted studies for numerous customers over a wide range of projects
We offer Process Hazard Analysis studies, PHA studies including Hazard and Operability studies, HAZOP studies, and as part of the risk analysis process Set up to identify and evaluate the potential undesirable events that may create hazards or operability problems (i.e. risk to personnel and potential damage to assets, the environment and the reputation) of the plant / site.
At petroproject we create , execute and analyze the managing contract to maximize operational & financial performance all while reducing financial risk we encounter an ever increasing amount of pressure to reduce costs and improve the performance contract management proves to be a very time consuming element of business which facilitate the need for effective and automated contract management system